Anthura Arndt
City: | Borken-Burlo, Germany |
Cultivation: | Breeding of Phalaenopsis, Anthurium and Bromelia |
Surface: | New construction: 13.000 m2 |
About this project
The Anthura Arndt location in Germany has been expanded with a brand new 1.3 hectare greenhouse. In this new section, they are using the latest techniques and are going to grow with maximum energy efficiency: 100% LED lighting, three energy screens and dehumidification systems. Plant quality naturally has the highest priority here.
We were able to contribute to this project by:
- Supplying and installing light reduction installations on the upper beam of the trellis
- Supplying and installing energy screen installations in the middle of the trellis
- Supplying and installing energy screen installations on the lower beam of the trellis
- Supplying and installing the Integra insect mesh system
The Dynamic pull wire was chosen for all installations here as the pull wire, especially suitable for more and heavier screen movements. This makes the installations last up to 10x longer.