Marjoland
| City: | Waddinxveen, Netherlands |
| Cultivation: | Roses |
| Surface: | 56.000 m2 |
About this project
In 2024, we have equiped the first 5-hectare section with a second energy screen. This was so successful that in 2025, we were asked to equip another 5 hectares with the second energy screen. The Huisman Dynamic pullwire was chosen for this project, which is specially developed for a longer lifespan even with frequent screen movements. To conclude, we also renovated the existing energy screen installations and replaced the roller screens.