Marjoland
Waddinxveen, Netherlands

Modification of existing installation to enable second energy screen

Marjoland

City: Waddinxveen, Netherlands
Cultivation: Roses
Surface: 56.000 m2

About this project

In 2024, we have equiped the first 5-hectare section with a second energy screen. This was so successful that in 2025, we were asked to equip another 5 hectares with the second energy screen. The Huisman Dynamic pullwire was chosen for this project, which is specially developed for a longer lifespan even with frequent screen movements. To conclude, we also renovated the existing energy screen installations and replaced the roller screens.

Project in pictures

Want to know more about this project?