The Valley
| City: | De Lier, The Netherlands |
| Cultivation: | Tomato and cucumbur |
| Surface: | 79.560 m2 |
About this project
A second energy screen will be added below the existing one in no fewer than eight sections.
| City: | De Lier, The Netherlands |
| Cultivation: | Tomato and cucumbur |
| Surface: | 79.560 m2 |
A second energy screen will be added below the existing one in no fewer than eight sections.
